Refine by

RESULTS : 21
Gort Case Study 2

Gort Glas Block

Kevin Jackson Architects were appointed by HSE Estates West to refurbish and extend the Gort Glas building on the south east corner of the St Josephs Hospital site in Ennis County Clare. 
Limerick Mid Western Hospital

Mid-Western Regional Hospital, Limerick

The construction of phase 2 of radiation oncology facilities at the Mid-Western Regional Hospital in Limerick is an excellent example of the use of ISOVER Acoustic Roll to ensure noise levels are kept under control and acoustic comfort is maintained. 
ISOVER Case Study Images

Parochial House Restoration in Kilkenny

This parochial house required a building fabric that consisted of a breathable wall lining system both internally and externally. The house dates back to 1828, and was built as a one off residential building.  Prior to the renovation, the existing walls were extremely cold and needed to be upgraded thermally. Because the building was a listed building by the Local Authorities, it was exempt from BER certification. The walls could not be sealed due to the conservation policies. Therefore, a ‘breathable’ system was installed internally using the Optima Dry Lining System.
ISOVER TLC Nursing Home

TLC Nursing Home Extension

Construction of a single storey building, which will be an extension of the existing Nursing Home facility, comprising of 49 single bedrooms, living areas, a dining room, kitchenette, treatment room, assisted bathroom, toilet, administrative areas and stores. The build should have a high airtightness & moisture control rating to ensure cost and energy savings, as well as thermal comfort for future residents.
Lester Weir 1

Portadown Airtightness House

The construction team at Lester Weir Joinery & Construction Ltd have recently completed their latest high performance thermal, airtightness & moisture control project, at the site of a new home build in Portadown, Co Armagh.
Respond Housing

Killiane Little

The strategy was to build a house, which required minimal additional heating and to use natural sources and retain that natural heat as efficiently as possible.
Skainos - Auditorium

Skainos

The  finished buildings use exposed concrete, automated natural ventilation controls, biomas boiler and solar panels to ensure a low carbon footprint sustainable development.
Quarrywood House

Quarrywood

Spacious family home utilizing the south facing aspect of the site, incorporating high standards of insulation to future proof the home.
Viking House Kilmallock - Building

Viking House Kilmallock

This is one of the world’s first Solar Enhanced Passive House projects, encompassing both Passive House and Sonnenhaus principles, all completed on a tight budget.
Priory Grove - External

Priory Grove

This project achieved a very balanced synthesis between contemporary design and energy efficiency.