The project involved a new build, detached, two-storey, three-bedroom house. After a thorough design period during which alternatives to foam insulation were sought, installation of airtightness & insulation materials commenced in October 2018.
The finished buildings use exposed concrete, automated natural ventilation controls, biomas boiler and solar panels to ensure a low carbon footprint sustainable development.